Healthcare facilities depend on building systems that perform reliably every hour of every day. As part of the Cleveland Clinic Weston’s 196,000-square-foot Emergency Department Expansion, the project team delivered new patient care spaces alongside a major Central Utility Plant designed to support the hospital’s long-term operational needs. Before patients and caregivers could depend on these systems, every component needed to be thoroughly tested and verified.
Motz Engineering provided commissioning services directly to the Construction Manager at Risk (CMR), serving as the connection between construction completion and operational readiness. Commissioning services included mechanical, electrical, and plumbing systems throughout the Emergency Department expansion, with responsibilities including drawing reviews, submittal reviews, pre-functional testing, and functional performance testing to verify that building systems operated in accordance with the design intent.
A key component of the project was commissioning the new Central Utility Plant, which included a 4,000-ton chilled water system, two 2-megawatt emergency generators, and five 800-ton cooling towers. These systems provide the reliable infrastructure necessary to support continuous hospital operations, making performance verification an essential part of the project before occupancy and patient care could begin.
Throughout commissioning, Motz Engineering worked collaboratively with the construction manager, design team, contractors, and hospital representatives to verify system performance, document results, and support a smooth transition from construction to facility operations. This collaborative approach helped identify issues before occupancy and reduce operational risk for the hospital’s facilities team.
For healthcare owners, commissioning extends far beyond verifying individual pieces of equipment. Complex hospitals depend on integrated mechanical, electrical, and plumbing systems working together to support patient care without interruption. Comprehensive commissioning helps identify issues before occupancy, validates system performance under real operating conditions, and provides facility teams with confidence that mission-critical infrastructure is prepared to support long-term operations.
The Cleveland Clinic Weston Emergency Department Expansion demonstrates Motz Engineering’s expertise in commissioning complex healthcare facilities where reliable building performance, operational readiness, patient safety and continuity of care are essential to project success.
PROJECT DETAILS
Market Healthcare
Client Cleveland Clinic
Location Weston, Florida
Services Commissioning
Project Size 196,000 SF
Project Type Emergency Department Expansion & Central Utility Plant
Delivery Method Construction Manager at Risk (CMR)
Engineering Highlights MEP commissioning, drawing reviews, submittal reviews, pre-functional testing, functional performance testing, central utility plant commissioning
Key Focus Hospital commissioning, emergency department expansion, central utility plant, operational readiness