Kroger’s corporate headquarters in Cincinnati relies on dependable building infrastructure to support daily operations for one of the nation’s largest retailers. When the existing chilled water plant serving the general office tower reached the end of its service life, Kroger partnered with Motz Engineering to develop a replacement strategy that maintained uninterrupted building operations while modernizing a critical mechanical system. 
 
Motz Engineering provided mechanical and electrical engineering services for the chilled water plant replacement, working directly with Kroger and its preferred contractors to deliver a procurement-focused engineering solution that emphasized speed, coordination, and constructability. The project combined elements of design-build and integrated project delivery, allowing the team to respond quickly while maintaining alignment with the owner’s schedule and operational priorities. 
 
To simplify installation and accelerate construction, the new chilled water plant was designed as a skid-mounted system for efficient assembly and delivery. Because the existing penthouse plant needed to remain operational throughout construction, the replacement plant was relocated to the building’s basement. Therefore, as part of the Review & Ensure phase of our IMPRESS Process, Motz assembled 3D BIM Model of the Chilled Water Plant to verify Construction Phasing & Logistics Planning – months ahead of field operations. Motz incorporated animation to review construction phases, step-by-step. Motz Engineering worked closely with the construction team to develop a detailed logistics and phasing plan that addressed equipment dimensions, weights, loading dock access, and installation sequencing while keeping the existing facility fully operational.  
 
As part of our Strengthen Phase of our IMPRESS Process, Motz Engineering also partnered with an equipment procurement specialist, SQL, LLC, to support equipment selection and purchasing, helping the project meet aggressive schedule milestones. Throughout construction, the engineering team remained actively engaged through weekly site observations, construction phasing reviews, pre-functional testing, equipment coordination, and ongoing support for both Kroger and its preferred contractors. 
 
The success of the project reflects Motz Engineering’s dedication to being a customer-focused company. Motz was able to conform to complex delivery models while serving as a trusted partner throughout design and construction by utilizing cutting-edge 3D BIM modeling to validate construction logistics and incorporating streamlined equipment procurement. Most importantly, the chilled water plant replacement was completed with minimal disruption to building occupants, allowing daily business operations to continue uninterrupted while critical infrastructure was modernized behind the scenes.

PROJECT DETAILS

Market Corporate Office

Client Kroger Corporate Headquarters

Location Cincinnati, Ohio

Services Mechanical Engineering, Electrical Engineering, Construction Administration, Equipment Procurement Coordination

Project Type Central Plant Replacement

Mechanical Systems Skid-mounted chilled water plant

Electrical Systems Electrical Distribution System modifications to accommodate new mechanical systems

Delivery Model Hybrid Design-Build / Integrated Project Delivery

Engineering Highlights Construction phasing, equipment logistics, pre-functional testing, weekly construction observation

Key Focus Business continuity, infrastructure modernization, contractor collaboration, schedule adherence

Kroger Chilled Water Plant Replacement electrical cables connected to terminal lugs
Large green industrial pipes with valve wheels connected to pumps in a mechanical room for Kroger Chilled Water Plant Replacement
Kroger Chilled Water Plant Replacement insulated pipes with valves and industrial pumps

Explore More Case Studies

Plumbing engineering for the University of Cincinnati Indoor Practice Facility, supporting hydrotherapy, training spaces, and campus utility systems for the 210,000-square-foot athletics facility.

UC Indoor Practice Facility

Plumbing engineering for the University of Cincinnati Indoor Practice Facility, supporting hydrotherapy, training spaces, and...
Plumbing and fire protection engineering supporting The Ohio State University's Battery Cell Research & Demonstration Center with clean room utilities, laboratory gas systems, and specialized infrastructure for advanced battery research.

OSU Battery Cell Research and Demo Center

Plumbing and fire protection engineering supporting The Ohio State University's Battery Cell Research & Demonstration...
Electrical engineering for the Ohio Showcase Building at the Ohio Expo Center, coordinating campus electrical infrastructure and lighting for the Ohio State Fair's signature public destination.

Ohio Expo Center

Electrical engineering for the Ohio Showcase Building at the Ohio Expo Center, coordinating campus electrical...